Termination occurs when the employer instructs a contractor to permanently stop the performance of work and leave the site. Construction contracts specify each party’s rights, obligations, and remedies for termination. Termination on construction projects often results in claims and disputes; therefore, the decision to proceed with this option should not be taken lightly.
There are two general types of termination typically addressed in construction contracts: termination for convenience and termination for cause (sometimes referred to as termination for default). In a termination for convenience, the owner may terminate the contract for whatever reason it wishes, such as economic/business reasons, or as the most expeditious way of eliminating a non-performing contractor with minimum risk of a legal dispute. Contractor’s remedies for termination for convenience vary from contract to contract, but may include a reasonable cost of work performed prior to termination, including profit, anticipated profits on uncompleted work, justifiable and reasonable termination costs including project wind-down costs and other costs as may be mutually agreed.
Termination for cause may occur when the owner believes the contractor has not performed according to its contractual obligations and thus has materially breached the agreement. Breach of a contract may terminate the obligations of the contract. Either one party or both parties have failed to perform an obligation as envisaged under the contract. A breach may usually occur when a party refuses to perform the contract, does something that the contract prohibits, or prevents the other party from performing its obligations. However, not all breaches end up in contract close-out.
A material breach is controversial that goes to the heart of the contract. The injured party can seek damages; that is, a monetary compensation enough to cover economic losses resulting from the breach of contract. For example, a contractor uses materials that are not in compliance with the specification. A material breach is any failure to perform that permits the other party to the contract to either compel performance, or collect damages because of the breach. If the contractor in the above example had been instructed to use copper pipes, and instead used iron pipes which would not last as long as the copper pipes would have, the employer can recover the cost of actually correcting the breach - taking out the iron pipes and replacing them with copper pipes. A contractor’s refusal to start work is clearly a material breach whereas a contractor’s installation of wrong ironmongery would be a non material breach.
Various circumstances can worsen to a degree that a disgruntled contractor has no option but to abandon the contract and walk off the site. Whether due to non payment, inadequate design drawings, too many instructions that cause the works technically different than envisaged in the original contract, excessive employer intervention, lack of cooperation from the engineer, or otherwise, the circumstances can be simply beyond the control of the contractor so that the decision to abandon the contract becomes inevitable. An analysis of when a contractor may justifiably abandon the contract begins with the fact of materiality. A breach is considered material if it substantially deviates the purpose of the contract and is serious enough to justify the other party in abandoning the contract.
A material breach releases the non breaching party from all obligations further owed to the breaching party under the contract whereas a non material breach will entitle the non breaching party to recover damages but will not releases him or her from further obligations. However, there is no litmus test that can readily distinguish the material breach from the non material breach. An immaterial breach of contract is therefore a trivial breach of contract and does not vitiate the contract. For example, a contractor for a HVAC system under which the maintenance is periodically taken place does not make inspections on a regular basis. This act is a technical breach of the contract but is immaterial as long as the ultimate objective of continuity of uninterrupted operation has been ensured.
Breach of contract is an actionable wrong. Non-compliance with the terms and conditions agreed upon entitles the party violating the same to resort to remedies available. Remedies for breach of contract may be embodied within the letters of the contract itself or in the absence of specific provisions in cases of breach; the applicable laws will supply the remedies. Common remedies for breach of contract more often includes demand for specific performance or rescission of the contract or claim for damages. It bears stressing that good faith must be exercised at all times. Full compliance with the terms and conditions laid down and specified in the contract must be observed. Breach of contract will definitely expose the erring party to liabilities, penalties and of course to such tremendous amount of inconvenience.
Some of the more commonly cited reasons for terminating a contract for cause include failure to pay labor, subcontractors, vendors, or material suppliers, failure to meet the project schedule or diligently perform the work, defective or deficient performance, failure to follow applicable laws or regulations and failure to consistently follow safety requirements.
Since some construction contracts provide for excusable delays, such as force majeure, the decisions to terminate for cause must also consider events which are excusable under the contract and prevent the contractor from performing as required. Termination-for-cause contract clauses vary from contract to contract, but some may require the owner to provide proper notice to the contractor of its alleged breach or failure to perform and provide a reasonable period for the contractor to cure, or start to cure, the alleged breach.
Typical claims from owners under termination for cause include, but are not limited to, the following, to the extent that they are not waived by contract the extended project duration and overhead costs (e.g., replacing one contractor with another almost invariably results in overall project delays), loss of profits or deferred production, liquidated damages or actual damages for delay and cost to complete the project if the final project costs exceed the value of the terminated contract less amounts paid to the terminated contractor.
Typical claims from contractors under termination for cause may include costs to bid the project, mobilization and demobilization costs, anticipated profit on the project, costs for work performed but not paid, home office overhead costs, winding-down costs, damages for loss of good will/loss of future business due to potential negative publicity following termination and betterment issues such as changes or upgrades included in the owner’s cost-to-complete damage model that are above and beyond the contractor’s original scope of work.
- Related Videos
- Related Articles
- Ask / Related Q&A
- Termination Claims in Nutshell
- Terminator Lawsuit
- Material Breach
- Surprises Are For Birthdays (and Other Tips For Avoiding Wrongful Termination Claims)
- Contract Law – Its Importance in the World Today
- Facts Of Wrongful Termination Attorney
- Fireballs From Cyberspace – Staying Out of Trouble in Software Development and Technology Contracts
- Auto Lease - How to Get Out Before Contract Ends




How to Select the Right Lawyers
By: Sarah Jose | 23/12/2009Selecting a lawyer who can get you out of the stress is indeed a painstaking task. How to locate the best lawyer? Is there any indicator to that effect?
Can You Retrieve Court Records For Free Online To Lookup Someones Court Cases
By: James Nash | 22/12/2009Did you ever have to search court records? If you have you surely know how hard that process can be because of the regulations and such. But thanks to the internet you don’t have to deal with long processes and such because you can find all the records that you need instantly.
Where Do You Find Court Records Free To Check Someones Criminal Past
By: James Nash | 22/12/2009If you want to find certain records you don’t have to follow regulations and deal with a lot of paperwork. You can simply find all kind of records that you need online, and best of all you can find them for free.
Allocation of Criminal Records
By: Kevin Jones | 22/12/2009How criminal records are allocated
Denomination of Criminal Records
By: Kevin Jones | 22/12/2009Different types of criminal records
How Can Solicitors Build Client Loyalty
By: Nick Jervis | 22/12/2009Solicitors are constantly facing competition from new competitors to their market. Should they give up or can they do something to preserve their client loyalty?
Leeds Solicitors - How to Choose the Right Leeds Solicitor for your Case
By: Michiel Van Kets | 22/12/2009Having legal problems is one of life's more stressful situations but having expert legal counsel in the form of a Leeds solicitor can make things much easier and give your real peace of mind. Proper legal advice can save you a lot of time and worry whether making a will, buying or selling a home, or dealing with employment-related legal problems in the Leeds area.
Do You Know Texas Law For DUI Charges?
By: Rudy Silva | 22/12/2009Do you want to know how to handle DUI charges? Each state has its own DUI laws. Driving under the influence of alcohol is a felony in Texas. Your involvement to DUI charges might give you headaches. If you need a free lawyer, the state can provide one for you. The state also has recovery programs. Read this article to learn about to solve your DUI charges.
Claims on Prolongation Costs in Nutshell
By: Dr. Chandana Jayalath | 03/11/2009 | ConstructionThe use of preliminaries on pro rata basis would not truly result the actual loss in prolongation. The level of compensation is what is reasonable in the circumstances. Each case shall be evaluated on its own merit.
Application of Causation, Remoteness and Foreseeability Tests in Determining Eligibility of Claims
By: Dr. Chandana Jayalath | 29/10/2009 | LawIt is a cumbersome exercise to be dealt with far remote facts, both for justification and evaluation.
Amendment, Deletion or Silence – Which One is Better?
By: Dr. Chandana Jayalath | 28/10/2009 | LawIt is always better not to touch the General conditions but to have proper amended clauses as long as the primary intension of the standard clauses are secured in the given the General section.
Claims for Loss of Profit on Omitted Works in Nutshell
By: Dr. Chandana Jayalath | 25/10/2009 | LawIf, however the instruction omitting works is a valid variation order, then whether a contractor can claim loss of profit on such omitted works depends upon the wording of the conditions of contract.
Termination Claims in Nutshell
By: Dr. Chandana Jayalath | 25/10/2009 | LawThere are two general types of termination typically addressed in construction contracts: termination for convenience and termination for cause (sometimes referred to as termination for default).
Recovery of Unabsorbed Head Office Overheads in a Contract Prolongation
By: Dr. Chandana Jayalath | 25/10/2009 | LawIt is impossible to accurately measure any under absorption of head office overheads whenever the damages become too remote and speculative. However, the contractor’s entitlement as to claim for additional overhead costs has been confirmed in case law.
Dealing with Suspension Claims in Nutshell
By: Dr. Chandana Jayalath | 25/10/2009 | LawA party, who wishes to exercise the right to suspend performance, runs the risk that their suspension will be regarded a failure to carry out the works regularly and diligently and may be treated as a repudiation of the contract, if in the particular circumstances no such right actually exists.
Dealing with Quantum Meruit Claims in Nutshell