Dot Plots

A dot plot graphically records variable data in such a way that it forms a picture of the combined effect of the random variation inherent in a process and the influence of any special causes acting on it. To understand the power of dot plots as a basic tool, it first helps to visualize how variation occurs.

Sometimes, statisticians explain random variation by using a device called a quincunx. A quincunx is a box with a series of pins arranged in such a way that a ball dropped in the top will bounce randomly down the pins until it comes to rest in one of the channels at the bottom.

By varying the entry point of the balls, it is possible to show how adding special causes to random variation would affect the distribution of produced values.

A funnel is used to ensure that the balls start at the same place. The pins then act like the essential variation inherent in any process. After enough balls have been dropped through the funnel, the filled channels begin to resemble a standard distribution curve or a histogram of a uniform distribution.

If, for example, the position of the funnel were moved systematically around a central point (+1, +2, +3, +3, +1, 0, -1, -2, -3, -2, -1, 0, etc.), the distribution of the balls in the channels would widen and flatten.

If the position of the funnel were alternated from side to side (+5, -5, +5, -5, etc.), the balls would eventually show a bi-modal or two-humped distribution. This is what a mixed lot of characteristics produced by two different suppliers, machines or workers might look like.

If the position of the funnel is moved steadily in one direction, then restarted and moved again in the same direction (0, +1, +2, +3, +4, 0, +1, +2, +3, +4, etc.), the distribution of the balls would form a plateau, a flat mountain with sloping sides. This may mimic what happens when a tool wears uniformly and then is replaced again and again.

If the position of the funnel is moved every now and then to a distant, off-center position, then returned to center (0, 0, 0, 0, 0, -7, 0, 0, 0, -7, 0, 0, 0, 0, 0, 0, 0, etc.), a group of outlying, disconnected balls would form. This could be like random, special-causes of variation, such as voltage spikes, that change process parameters.

Dot plots are the converse of quincunx experiments. To create a dot plot, each data point is recorded and placed as a dot on a graph. As additional data points with the same value as the first one occur, they are stacked like the balls in the quincunx channels. After many values have been recorded as dots, the resulting pattern can tell you something about the variation in your process.

What can it do for you?
• A dot plot can give you an instant picture of the shape of variation in your process. Often this can provide an immediate insight into the search strategies you could use to find the cause of that variation.
• Dot plots can be used throughout the phases of Lean Six Sigma methodology. You will find dot plots particularly useful in the measure phase.

How do you do it?
1. Decide which Critical-To-Quality characteristic (CTQ) you wish to examine. This CTQ must be measurable on a linear scale. That is, the incremental value between units of measurement must be the same. For example, time, temperature, dimension and spatial relationship are usually able to be measured in consistent incremental units.
2. Measure the characteristic and record the results. If the characteristic is continually being produced, such as voltage in a line or temperature in an oven, or if there are too many items being produced to measure all of them, you will have to sample. Take care to ensure that your sampling is random.
3. Count the number of individual data points.
4. Determine the highest data value and the lowest data value. Subtract the lower number from the higher. This is the range. Use this range to help determine a convenient scale. For example, if the range of your data points was 6.7, you may want to use an interval of 8 or 10 for your scale.
5. Next, determine how many subdivisions or columns of dots your scale should have. To make an initial determination, you can use this table:

Data points ----------- Subdivisions
under 50 ----------- 5 to 7
50 to 100 ----------- 6 to 10
100 to 250 ----------- 7 to 12
over 250 ----------- 10 to 20

6. Divide the range by the number of subdivisions. You may round or simplify this number to make it easier to work with, but to get the best picture of the distribution of data points, the total number of subdivisions should be close to those shown above. You may want to increase the number of measurements, if that is possible, to provide a convenient scale. In determining the number of subdivisions, also consider how you are measuring data. Increase or decrease the number of subdivisions until there is essentially the same number of measurement possibilities in each one.
7. Divide the scale you have chosen by the appropriate number of subdivisions. Draw a horizontal line (x axis) and label it with the scale and the subdivisions.
8. Make a dot above the scale subdivision for each data point that falls in that subdivision. For subsequent data points in a subdivision, place a dot on top of the previous one. Make all the dots the same size and keep the columns of dots vertical.
9. If there are specification limits for the characteristic you are studying, indicate them as vertical lines.
10. Title and label your dot plot.

Now what?
The shape that your dot plot takes tells a lot about your process. In a symmetric or bell-shaped dot plot, the frequency is high in the middle of the range and falls off fairly evenly to the right and left. This shape occurs most often. If your dot plot takes other shapes, you should look at your process for otherwise unseen causes of variation.

In a comb or multimodal type of dot plot, adjacent subdivisions alternate higher and lower in frequency. This usually indicates a data collection problem. The problem may lie in how a characteristic was measured or how values were rounded to fit into your dot plot. It could also indicate a need to use different subdivision boundaries.

If the distribution of frequencies is shifted noticeably to either side of the center of the range, the distribution is said to be skewed. When a distribution is positively skewed, the frequency decreases abruptly to the left but gently to the right. This shape normally occurs when the lower limit, the one on the left, is controlled either by specification or because values lower than a certain value do not occur for some other reason.

If the skewness of the distribution is even more extreme, a clearly asymmetrical, precipice-type dot plot is the result. This shape frequently occurs when a 100% screening is being done for one specification limit.

If the subdivisions in the center of the distribution have more or less the same frequency, the resulting dot plot looks like a plateau. This shape occurs when there is a mixture of two distributions with different mean values blended together. Look for ways to stratify the data to separate the two distributions. You can then produce two separate dot plots to more accurately depict what is going on in the process.

If two distributions with widely different means are combined in one data set, the plateau splits to become twin peaks. Here, the two separate distributions become much more evident than with the plateau. Again, examining the data to identify the two different distributions will help you understand how variation is entering the process.

If there is a small, essentially disconnected peak along with a normal, symmetrical peak, this is called an isolated peak. It occurs when there is a small amount of data from a different distribution included in the data set. This could also represent a short-term process abnormality, a measurement error or a data collection problem.

Some final tips
• A dot plot is an easy way to make a picture of the statistical variation in your process.
• Dot plots can quickly give you a comparative feel of sets of data, but they do have limitations. Because of the rounding of measured data to fit into created subdivisions, the resulting shape of the dot plot may be somewhat arbitrary. A slight adjustment in defining the subdivisions may produce a slightly different picture.
• If specification limits are involved in your process, the dot plot can be an especially valuable indicator for corrective action.
• A dot plot can show you not only if your process is in control, but also if it is relatively centered on your target value and if the variation in your process is within the specified tolerances.
• Not only can dot plots help you see which processes need improvement, by comparing initial dot plots with subsequent ones, they can also help you track that improvement.

Steven Bonacorsi

Steven Bonacorsi is a Senior Master Black Belt instructor and coach. Steven Bonacorsi has trained hundreds of Master Black Belts, Black Belts, Green Belts, and Project Sponsors and Executive Leaders in Lean Six Sigma DMAIC and Design for Lean Six Sigma process improvement methodologies.

The AIT Group, Inc.
Steven Bonacorsi, Solution Provider
Lean Six Sigma Master Black Belt
3135 South Price Road, Suite 115
Chandler, AZ 85248-3549
Phone: +(1) 888.826.2484
E-mail: americas@theaitgroup.com
http://www.theaitgroup.com

Rate this Article: 5 / 5 stars - 1 vote(s)
Print Email Re-Publish

Add new Comment



Captcha

  • Latest Management Articles
  • More from Steven Bonacorsi

What is Automatic Data Capture?

By: Ray Feoli | 26/12/2009
It's been called the "Supply Chain of the Future" and is being implemented by more companies to streamline business proficiencies every day. So although you may have heard of automatic data capture, you may be asking, "What exactly is it?" In this article, you will learn some of the main...

Reasons Your Records Should Be in Digital Format Rather Than on Paper

By: Ray Feoli | 26/12/2009
During a time when digitally maintained records are an affordable and easy to implement solution to your document management needs, the real question should be, "Why WOULDN'T your records be in digital?" Let's go through some of the many reasons why your business would benefit by going digital with its...

What is the True Value of Your Store Inventory?

By: Ryan J Bell | 26/12/2009
The goods that sit on your shelves and floor represent a major capital expenditure. In reality, it likely represents one of the largest expense classes on your books (though technically-speaking, it carries as an asset). Many independent outlets understand that carrying their inventory is dear. However, they realize it in...

Handling Employee Absenteeism

By: Mark Thomas Walters | 26/12/2009
To deal with the issue of employee absenteeism, it is necessary to look beyond the surface of the issue, as there is no quick fix to the problem. Firstly, punitive measures are unlikely to work because there is always a way around them. Even if they appear to work with some,...

Easy Ways To Manage Critical Business Documents

By: Ray Feoli | 25/12/2009
Documents claim up to 60 percent of office worker's time and account for up to 45 percent of labor costs. Documents are a necessary evil to the function of any business. You can no longer just file it away and forget about it, you have to actually MANAGE it. Do yourself...

Four Critical Ingredients to a Successful 6 Sigma Implementation

By: Ryan J Bell | 25/12/2009
The six Sigma strategy is steeped in info collection and statistics analysis. As such, many practitioners fall into the mistake of thinking the success of a given project is a foregone conclusion. That is, so long as they stick closely to a quantitative approach, identifying and getting shot of process-related...

The Role of a Leader in a Six Sigma Implementation

By: Ryan J Bell | 25/12/2009
One of the reasons there is a tightly outlined structural power structure within a standard six Sigma team is because such a structure supports a leader. That individual is immediately responsible for the results produced by their team. the leader's responsibility extends further. She determines the focus and direction of...

Grasping the Responsibilities in the 6 Sigma Hierarchy

By: Ryan J Bell | 25/12/2009
The success of your Six Sigma program relies on many factors. These elements include severe identification of relevant metrics, creative problem-solving, targeted decision-making, and observance of a stern organizational power structure. Courses and workshops are typically dedicated to the trials of the technique. They concentrate on subjects such as project...

5s - Foundation for Continuous Improvement

By: Steven Bonacorsi | 09/02/2009 | Management
5s is a continuous improvement methodology that is simple to understand and easy to implement and considered a foundation for continuous improvement. Sort, Set in Order, Shine, Standardize, and Sustain

Mistake Proofing

By: Steven Bonacorsi | 02/10/2008 | Management
Mistake proofing is a technique for eliminating errors. It is based upon the premise that it is good to do something right the first time; it is even better to make it impossible to do it wrong the first time. The idea is to make it impossible to make a mistake. You may also hear the term, Poka-Yoke or Error Proofing applied to mistake proofing.

Cause and Effect Diagrams (fishbone Diagrams)

By: Steven Bonacorsi | 25/04/2008 | Management
The first such cause-and-effect diagram was used by Kaoru Ishikawa in 1943 to explain to a group of engineers at the Kawasaki Steel Works how various work factors could be sorted and related. In recognition of this, these diagrams sometimes are called Ishikawa diagrams. They are also called fishbone diagrams, because they look something like fish skeletons.

Critical Path Mapping

By: Steven Bonacorsi | 24/04/2008 | Project Management
The activity network diagram has had a relatively long history, dating back to the 1930s. In the 1950s, the technique emerged as the Program Evaluation Research Technique (PERT) and as the Critical Path Method (CPM). There are several ways to represent the output of the PERT/CPM process.

Box Plots

By: Steven Bonacorsi | 21/04/2008 | Management
Box-and-whisker diagrams, or Box Plots, use the concept of breaking a data set into fourths, or quartiles, to create a display. The box part of the diagram is based on the middle (the second and third quartiles) of the data set. The whiskers are lines that extend from either side of the box. The maximum length of the whiskers is calculated based on the length of the box. The actual length of each whisker is determined after considering the data points in the first and the fourth quartiles.

Dot Plots

By: Steven Bonacorsi | 20/03/2008 | Management
A dot plot graphically records variable data in such a way that it forms a picture of the combined effect of the random variation inherent in a process and the influence of any special causes acting on it. To understand the power of dot plots as a basic tool, it first helps to visualize how variation occurs.

Run Charts

By: Steven Bonacorsi | 13/03/2008 | Project Management
Run charts can be very valuable in helping your search for sources of variation. They are easy to plot and easy to interpret. The sampling is uncomplicated, and there are no statistical computations to make. They can also be applied to almost any process or any data.

Scatter Diagrams

By: Steven Bonacorsi | 10/03/2008 | Training
A scatter diagram shows the correlation between two variables in a process. These variables could be a Critical-To-Quality (CTQ) characteristic and a factor affecting it, two factors affecting a CTQ or two related quality characteristics. Dots representing data points are scattered on the diagram. The extent to which the dots cluster together in a line across the diagram shows the strength with which the two factors are related.

Submit Your Articles Free: Signup
Article Categories




Use of this web site constitutes acceptance of the Terms Of Use and Privacy Policy | User published content is licensed under a Creative Commons License.
Copyright © 2005-2008 Free Articles by ArticlesBase.com, All rights reserved. (0.93, 1, w3)